2020 Authorizations

Date of Event Applicant Purpose Community Benefit
Sep 13, 2018 – Dec 31, 2020 Toronto and Region Conservation Authority Construction of a near shore reef and groyne
Location: Gibraltar Point
Protection of shoreline erosion
Oct 1, 2019 to Mar 1, 2021 Soletanche Bachy Canada - Dockwall Repairs Times: Daylight Hours
Location: Dockwall Repair to the north side (eastern end) of the Western Channel
Dockwall Replacement
Jan 6, 2020 – Aug 30, 2024 Toronto and Region Conservation Authority Landform Construction Projects, includes infill, berm and breakwater construction
Location: Ashbridge’s Bay
Protection of shoreline erosion and reduce dredging requirement at Ashbridge’s Bay

 

Boaters Notice

PortsToronto is responsible for keeping the Toronto Harbour safe and navigable. See Boater’s Notices about everything from swimming in the harbour to obtaining permission for a marine event.

Do you have one?

A Power Vessel Operator’s Permit is required to operate a powered vessel in the Port and Harbour of Toronto.

Get permit