2021 Authorizations

Date of Event Applicant Purpose Community Benefit
Oct 1 2019 to Mar 1 2021

Soletanche Bachy Canada

Dockwall Repair 

Location: North side (eastern end) of the Western Channel

Dockwall Replacement
Jan 6 2020 to Aug 30 2024 Toronto and Region Conservation Authority

Landform Construction Project, includes infill, berm and breakwater construction

Location: Ashbridge’s Bay

Protection of shoreline erosion and reduce dredging requirement at Ashbridge’s Bay

Feb 5 2020 to Dec 22 2023 Ellis Don Operation of water discharge structure
Location: Ship Channel
Waterfront Toronto's Portlands Flood Protection Project
Mar 4 2020 to Dec 31 2023 Toronto and Region Conservation Authority Breakwater Construction Project
Location: Ashbridge's Bay
Protection of shoreline erosion and reduce dredging requirement at Ashbridge's Bay
Nov 20 2020 to May 31 2021 Toronto and Region Conservation Authority Construction of reef and placement of rip rap materials
Location: Ashbridge's Bay
Protection of shoreline erosion at southeast side of Ashbridge's Bay
Nov 27 2020 to Nov 16 2021 Ellis Don Operation of water intake
Location: various Portland locations
Waterfront Toronto's Portlands Flood Protection Project
Dec 7 2020 to Apr 12 2021 Island Yacht Club

Annual installation and removal a boardwalk during the winter months 

Location: Between Muggs Island and Centre Island

Providing ability for Island Yacht Club employees to access required facilities

Jan 12 to Feb 26 2021 McNally Construction Removal of 92m water pipe
Location: Long Pond
Providing safe and navigable waters to boaters
Feb 22 to May 31 2021 Toronto and Region Conservation Authority Construction of aquatic habitat
Location: northside of Tommy Thompson Park
Providing and sustaining a natural environment for the enjoyment of the community
Mar 5 to Dec 31 2021 Toronto and Region Conservation Authority Environmental monitoring activities including water / sediment sampling
Location: the jurisdiction of the Toronto Port Authority
Environmental Studies benefiting the Toronto Harbour
Mar 19 to Dec 31 2021 Riggs Engineering Ltd.

Collection of sediment samples and bathymetric survey data

Location: Various locations in the harbour, including Coronation Park, Keating Channel, Polson slip and Outer Harbour

Environmental Studies benefiting the Toronto Harbour
Apr 1 to Oct 1 2021 University of Toronto Environmental monitoring of floating litter and plastics from various pathways into the Toronto harbour Environmental Studies benefiting the Toronto Harbour
Apr 6 to May 10 2021 Geophysics GPR International Inc.

Collection of bathymetric and seismic survey data

Location: Yonge St slip, Parliament St slip and Jack Layton Ferry slips

Environmental Studies benefiting the Toronto Harbour

Apr 21 to 22 2021

Shadows S3 Television Productions

Film production

Location: Outer Harbour Marina

Supporting film industry

Apr 21 to May 21 2021 Terrapex Environmental Ltd.

Borehole drilling

Location: Yonge St, Parliament St slips and between Jarvis St and Parliament St slips

Environmental Studies benefiting the Toronto Harbour

Apr 28 to Jun 30 2021

QM Environmental

Dockwall Demolition 

Location: East end of Polson St slip

Demolition and construction done in conjunction with the Portland Flood Protection Project

May 6 to Dec 15 2021

Toronto and Region Conservation Authority

Water quality monitoring 

Location: Keating Channel

Environmental Studies benefiting the Toronto Harbour

May 11 to 30 2021

Cherubini

Delivery of the new Commissioners St bridge span

Location: Ship Channel

Waterfront Toronto’s Portlands Flood Protection Project 

May 12 to Aug 30 2021

Toronto and Region Conservation Authority

Install of three permanent navigational lights 

Location: West of the new reef at Gibraltar Point

Navigational safety for watercraft around this new environmental reef

May 2021 to Oct 2022

Dean Construction

Extension of the Enwave intake pipes

Location: South of Center Island

Expansion of the Enwave Deep Lake Water Cooling System

May 2021 to Nov 2021

Great Lakes Laboratory for Fisheries and Aquatic Sciences, Fisheries and Oceans Canada

Plankton and water quality sampling Toronto Harbour and Tommy Thompson Park

Environmental Studies benefiting the Toronto Harbour

Jun 2021 to Jul 2021

Belor Construction Ltd.

Construction work on new Cherry Street North Bridge in the Keating Channel

Cherry Street North Bridge repair



May 6 to Dec 15 2021

 

Ashbridge’s Bay Yacht Club

Seasonal sailing activities 

Location: Ashbridge’s Bay

Community Program


 

Avis aux plaisanciers

Il incombe à PortsToronto de s'assurer que le havre de Toronto demeure sécuritaire et navigable. Consultez les avis aux plaisanciers pour connaître toute l'information, notamment au sujet de la baignade dans le havre et de l'obtention d'une permission pour une activité maritime.

En avez-vous un?

Un permis de conducteur de bateau motorisé est requis pour exploiter un navire à moteur dans le port et le havre de Toronto.

Obtenir un permis