Update: Ship Channel Bridge to Re-Open to Vehicle and Marine Traffic on Saturday, March 14 Following Successful Completion of Repairs
14/03/2020
Toronto (March 14, 2020) – PortsToronto is pleased to announce that necessary bridge-deck grating required for the Ship Channel Bridge has been completed earlier than anticipated. As a result, the Ship Channel Bridge will re-open to vehicle and marine traffic at 2:00 p.m. on Saturday, March 14.
-30-